A client in the food and drink sector recently approached JBC about the reliability of their existing boiler water level controls.

White arrow

Go back

About the project icon

About the project

The equipment installed on-site was becoming obsolete, raising concerns about the availability of replacement parts in the event of a failure. Given the critical role the boiler system plays in production, any unplanned downtime could have serious consequences for output and operational continuity. The client’s primary goal was to upgrade the system before reliability became a problem, ensuring both compliance and peace of mind.

Project goals icon

Project goals

The solution involved replacing the outdated water level control system with a new control setup, including a HMI upgrade. To further support safe and efficient boiler operation, we also integrated timed automatic bottom blowdown TDS controls, aligning the system with current BG01 guidance for boiler compliance and safety.

By retrofitting the new components into the existing control panel, we were able to reduce installation costs and avoid unnecessary disruption. The upgrade was carried out efficiently, ensuring minimal downtime for the client’s production line.

Our solutions icon

Our solutions

The upgrade has significantly reduced the risk of downtime by removing reliance on obsolete parts. The new controls offer improved reliability, easier fault diagnostics, and full compliance with current boiler safety standards. With minimal disruption and long-term benefits, the client now has a more dependable system that supports both safety and production continuity.