Safety Assurance During Planned Boiler Maintenance at a Paper Manufacturing Facility

Recently, the Safety Assurance Team completed an audit at a paper manufacturing facility specialising in industrial cardboard production, where planned boiler maintenance works were taking place.

White arrow

Go back

About the project icon

About the project

The audit covered key areas including health & safety documentation, gas safe compliance, risk assessments and method statements (RAMS), tools and equipment, lock out tag out (LOTO) procedures, working at height, emergency arrangements and site procedures.

The inspection found that JBC personnel had been fully inducted onto the site and signed onto the permit system as required. Dynamic risk assessments had been completed to a good standard, with all JBC personnel signing onto the assessment before work commenced. Access and egress routes were generally well maintained, with walkways remaining clear of materials, tools and trailing cables, while overhead hazards created by scaffolding had been appropriately managed.

Project goals icon

Project goals

The audit highlighted several examples of good practice throughout the project.

Working at height arrangements were compliant, with a correctly inspected low-level podium being used alongside suitably erected and tagged scaffolding. Hand tools and powered equipment were observed to be in good condition, appropriately maintained and stored correctly. LOTO procedures had been implemented in accordance with both JBC and the site's procedures, with all services safely isolated before work began. Training records also confirmed that our engineer on site held current confined space and face-fit certification should they be required.

Where observations were identified, they were addressed promptly. During the inspection, the review of the steam isolation arrangement identified that the proposed isolation did not fully align with JBC's safe steam isolation procedure regarding positive isolation. JBC immediately implemented a compliant method by removing the crown valve and fitting a blank, ensuring the system was left in a safe condition before work began.

Our solutions icon

Our solutions

Alongside recognising good performance, safety assurance audits are designed to identify opportunities to strengthen safety and compliance.

During this visit, the audit identified that the client's Boiler House Risk Assessment was not available at the time of inspection. This has been referred to the relevant teams for further support. The audit also highlighted that RAMS could not be accessed electronically due to poor mobile signal on site, prompting an internal action to review how critical documentation can remain accessible in low-connectivity environments.

A further observation identified that although fire safety signage was present at both exits, a CO₂ fire extinguisher was not located at the secondary fire exit. This was reported to the client for review as part of the audit findings.

Overall, the inspection demonstrated strong levels of safety management, good compliance with site procedures and a proactive approach from both the JBC team and the site. By identifying improvements, implementing immediate corrective actions where required and sharing best practice, our safety assurance team continues to support safer working environments across every project we deliver.