About the project
In 2025, JBC was awarded a 5-year Service & Maintenance Agreement with a large North West based University, covering all industrial steam and hot-water boilers, burners, and associated plant across its estate. The university operates one of the largest and most complex estates in the UK higher education sector, with multiple industrial boilerhouses supplying steam and hot water to laboratories, research facilities, and critical campus infrastructure.
The appointment followed a competitive tender process, with JBC selected for its strong local engineering presence, guaranteed emergency response capability, and proven technical expertise in industrial boilerhouse operations
Project goals
The university’s boilerhouses presented several challenges, including a wide variety of ageing boilers from multiple OEMs, obsolete burners and control systems with limited manufacturer support, and legacy components beyond their recommended service life. Documentation and maintenance practices were inconsistent between sites, while a high demand for emergency response highlighted the need for improved reliability and proactive planning to maintain continuous operation of research and teaching facilities.
As part of mobilisation, JBC engineers completed a detailed review of each boilerhouse to assess condition, safety, and compliance with BG01 and BG02 guidance. Findings confirmed risks associated with obsolete burners and ageing controls, limitations in compliant isolation arrangements, and a predominantly reactive maintenance approach.
Our solutions
JBC implemented a programme to improve safety, compliance, and operational resilience across the estate. This included replacement of obsolete burners, level controls, and safety components with modern supported technology, alongside installation of compliant double block and bleed isolation arrangements to improve safety and serviceability.
Inspection and service documentation were standardised across all sites, supported by a structured maintenance programme aligned with BG01 and BG02 requirements. Our engineering team were deployed to provide continuity, technical familiarity, and guaranteed emergency response.
Since the start of the agreement, JBC has responded quickly to multiple breakdowns, maintaining critical university operations, while delivering complex engineering modifications and system upgrades that have improved reliability, efficiency, and compliance. The partnership demonstrates JBC’s ability to combine fast local response with deep technical expertise to ensure dependable steam and hot-water systems throughout the contract term.