A major UK fuel storage and distribution terminal required the modernisation of two industrial steam boilers supporting critical operations, including pumping, storage stability and fuel transfer processes. The existing burners and water level controls had reached the end of manufacturer support, creating maintenance challenges and limiting performance. The upgrade also needed to be completed with minimal disruption to the site's continuous operation.
Project goals
JBC completed a full burner and controls upgrade across both steam boilers. The obsolete Hamworthy burners were replaced with two new gas burners, improving turndown capability and combustion performance. JBC's Ecosafe, a digital burner management system was installed to provide precise burner control, alongside an upgraded Ecosafe water level control system using a water level expansion unit and capacitance probes.
The project also included variable speed drive controlled combustion fans to reduce electrical consumption, together with the mechanical and electrical modifications required to integrate the new burners, fuel systems, safety functions and control systems.
Our solutions
The upgrade has improved the efficiency, reliability and long-term supportability of the steam plant. Improved combustion control and increased burner turndown have contributed to an estimated 4% reduction in fuel consumption, while the VSD-controlled combustion fans have lowered electrical usage.
By replacing obsolete equipment with modern controls, the site has also benefited from improved diagnostics, enhanced safety features and a more maintainable boiler plant. The project demonstrates how targeted combustion and controls upgrades can improve operational performance while extending the service life of critical assets.