Ecosafe Case Study

Our client benefitted from the following energy savings by installing:

Retrofit digital combustion controls              5%

Variable speed drive to FD fan                       2%

Flue gas economiser                                        5%

 

Minor alterations were also made to the hotwell and condensate return. Some steam traps were replaced to assist in a further saving of 1%.

Total saving                                                           13%

Annual cost saved                                              £43,500

CO2 saved (pa)                                                     537 Tonnes

 

Modifications to the boiler house can be substantial when the payback justifies the means: several areas can achieve realistic savings.